STANDARD BRIDGE AI

ELECTRICAL STANDARD CLARIFICATION

Find the evidence gap.
Ask the right engineering question.

Review a Chinese test report against the standard, project specification or owner requirement your project expects — then turn every material difference into a traceable manufacturer clarification.

Evidence-linked differencesNo product recommendationManufacturer-ready questions
THE OUTPUTA clearer
technical dialogue
REPORTGAPQUESTION

Preliminary screening for procurement clarification — not a certificate or final engineering approval.

01

SUPPLY THE EVIDENCE

Start with the documents, not assumptions.

Upload the Chinese report first. Add the target report, project specification or exact owner clauses whenever available.

DOCUMENT EVIDENCE

Document handling in this preview
  • The original PDF is read in your browser and is not uploaded as a file.
  • Extracted text and the project context are sent for AI analysis only after you click review.
  • This preview does not create an account or saved project library. Clear the workspace before leaving a shared device.

Remove supplier names, prices and project identifiers if they are not needed for the technical comparison. Scanned PDFs require OCR and will be rejected clearly.

PROJECT CONTEXT

Operating conditionsOptional at screening · important before acceptance

Relevant details for this family: Add any known rating, duty or owner requirement.

Baseline screening only

Without target clauses, the tool will identify evidence gaps and questions to verify — not assert exact IEC compliance.

PROCUREMENT EVIDENCE GUIDES

Common Chinese-report questions,
organised by equipment family.

Use these starting points to identify which target clauses and test evidence to supply. They are navigation aids, not substitutes for the governing standard or project specification.

TRANSFORMERS

GB/T 1094 and IEC 60076 evidence

Check whether ratings, frequency, insulation levels, temperature rise, losses, sound level and special dry-type classifications are supported for the offered unit.

  • Type-test applicability
  • Offered unit versus tested unit
  • Project environmental classes
Review transformer evidence →
MV SWITCHGEAR

GB 3906 and IEC 62271 evidence

Separate basic ratings from project-specific service continuity, internal arc classification, compartment accessibility and test configuration.

  • IAC and LSC evidence
  • Short-circuit duty
  • Accessories and interlocks
Review switchgear evidence →
LV ASSEMBLIES

GB/T 7251 and IEC 61439 evidence

Verify the assembly design, short-circuit strength, temperature-rise limits and form of separation instead of relying only on component certificates.

  • Design verification route
  • Assembly versus components
  • Declared operating conditions
Review LV assembly evidence →
BUYER CHECKLIST

How to read a Chinese type-test report

Identify the report owner, tested model, referenced edition, test laboratory, page continuity and the relationship between the tested and offered configurations.

  • Scope and traceability
  • Missing versus failed evidence
  • Questions for the manufacturer
Start an evidence review →

A PRACTICAL TOOL FROM HJATIS

Better procurement starts with a clearer technical question.

StandardBridge helps international buyers structure a traceable conversation with any manufacturer engineer. The free result is available before any contact request. It does not recommend a product or claim that HJATIS equipment meets the reviewed requirement.